App Logo

No.1 PSC Learning App

1M+ Downloads
Unit rate of work is obtained by

ARate analysis

BBy ready reckoners

CBy field study

DBy Govt. notification

Answer:

A. Rate analysis


Related Questions:

Maximum permissible FAR for residential building shall be
The eccentricity of the parabola will be
The modules of elasticity of concrete improves with
Optimum moisture content is the moisture content at maximum:
A- 4 hour unit hydrograph of a certain basin has peak ordinate of 80 m³/s the peak ordinate of a 2 hour unit hydrograph for the same basin will be