App Logo

No.1 PSC Learning App

1M+ Downloads
What are the key factors for strategic venue selection for DMEx activities?

AAvailability of the largest possible space, regardless of other factors.

BAesthetic appeal and comfort for organizers only.

CAccessibility for all participants, sufficient capacity, and paramount safety considerations.

DProximity to the senior leadership's residence.

Answer:

C. Accessibility for all participants, sufficient capacity, and paramount safety considerations.

Read Explanation:

When planning a DMEx, especially for a location like Kochi, Kerala, India, the venue is critical to its success and realism. These factors ensure:

  • Accessibility for all participants: This means the location should be easily reachable for all involved personnel, including first responders coming from different areas, community members (including vulnerable populations with specific access needs), and observers. Good road networks, public transport access, and consideration for movement of emergency vehicles are vital.

  • Sufficient capacity: The venue must be large enough to host the number of participants, equipment, and simulated scenarios. This could involve open spaces for large-scale operations, indoor areas for command centers, and diverse environments to replicate real-life disaster conditions.

  • Paramount safety considerations: Above all, the safety of all participants is non-negotiable. This involves assessing potential hazards at the venue, ensuring clear evacuation routes, having medical support on standby, and adhering to all safety protocols throughout the exercise. The venue itself should not introduce new risks to the exercise.

Choosing a venue that meets these criteria allows for a realistic, effective, and safe DMEx, directly contributing to enhanced disaster preparedness for the region.


Related Questions:

Consider the following statements regarding floods and flash floods.

  1. All floods are specifically defined as occurring within six hours of heavy rainfall.
  2. Flash floods are a specific type of flood characterized by rapid onset and swift water flow.
  3. An increase in reservoir levels can lead to a general flood, but not a flash flood.
    Who gives the Red List?

    Identify the incorrect statement(s) regarding the key components of effective disaster preparedness.

    1. Evacuation plans and incident response setup are not considered essential for preparedness.
    2. Standardization of relief procedures and logistics management are crucial components.
    3. Disaster insurance is recognized as an important component for effective preparedness.

      Which of the following statements accurately describe a mock drill?

      1. A mock drill is an action-based exercise that simulates an emergency situation and involves rehearsing a physical response.
      2. The distinguishing feature of mock drills is their narrow focus, where a single task or process is repeatedly carried out to achieve mastery.
      3. Mock drills are primarily designed for theoretical understanding and do not involve any physical movement or response.
        The World Wetlands Day is observed annually on which date, across the world?