What is the full form of MPS in manufacturing?

AMaster Production Schedule

BManufacturing Production Section

CMinimum Production Schedule

DMaximum Production Section

Answer:

A. Master Production Schedule

Read Explanation:

Master production Schedule (MPS) is a complete time table of scheduled production in future. It contains information about what product is to be produced, when it is to be produced and in what Quantity