Challenger App

No.1 PSC Learning App

1M+ Downloads
When we view processes as interconnected components of a system, we tend to avoid:

ARoot causes

BCapacity utilization

CProcess variance

DSub optimization

Answer:

C. Process variance

Read Explanation:

When viewing processes as interconnected components of a system, sub optimization should be avoided. This is because sub optimization focuses on individual components rather than the system as a whole. The performance of the system is more important than the performance of individual components. Therefore, it is crucial to consider the system as a whole rather than just its individual components.


Related Questions:

__________is also called line layout.
The number of averaging period in the simple moving average method of forecasting is increased for greater smoothing but at the cost of

Which of the following input data are needed for MRP?

  1. Master production schedule
  2. Inventory position
  3. Machine capacity
  4. Bill of materials
    Basic tool in work-study is
    Material Requirements Planning DOES NOT include