Which of the following has minimum detention period

AGrit chamber

BSedimentation tank

COxidation ditch

DOxidation pond

Answer:

A. Grit chamber


Related Questions:

The structure which is constructed to connect a high level branch sewer to a low level main sewer with minimum disturbance is called
The process of killing pathogenic bacteria of water borne diseases to make it safe for use in hospital is called:
In the design of storm sewers, time of concentration relevant of determine the
The drop manholes are generally provided in sewers for
The self cleaning velocity of the sewers is: