Solution:

Given:

A and B  take 5 days

B and C take 7 days

A and C take 4 days

Solution:

LCM(5, 7, 4) = 140 let total work be 140 unit

Time

Work

Efficiency

5

  140

28

7

20

4

35

The efficiency of A, B, C are

⇒ 2(A + B + C) = 28 + 20 + 35 = 83

⇒ A + B + C = 83/2 = 41.5

⇒ A = (A + B + C) - (B + C) = 41.5 - 20 = 21.5

By the same process

⇒ B = 41.5 - 35 = 6.5

⇒ C = 41.5 - 28 = 13.5

⇒ Time(A) = 140/21.5 = 6.51

⇒ Time(B) = 140/6.5 = 21.54

⇒ Time(C) = 140/13.5 = 10.37

A took the least time to complete the work. So, A is the fastest.

∴ A finishes fastest in 6.51 days.


Related Questions:

Two pipes A and B can fill a tank in 15 hours and 20 hours, respectively, while a third pipe C can empty the full tank in 30 hours. If all the three pipes operate simultaneously, in how much time will the tank, initially empty, be filled?
Two pipes are connected to a water tank. The first pipe can fill the tank in 10 minutes and the second pipe can empty it in 15 minutes. If both pipes opened simultaneously, then find the time in which the tank will be completely filled with water.
Rajeshwar can do a piece of work in 12 days, Vikram in 6 days and Tiger in 15 days. They all start the work together, but Rajeshwar leaves after 2 days and Vikram leaves 3 days before the work is completed. In how many days is the work completed?
A and B together can do a certain work in x days. Working alone, A and B can do the same work in (x + 8) and (x + 18) days, respectively. A and B together will complete 5/6 of the same work in:
15 പേർ 8 ദിവസം കൊണ്ട് 40 പാവ ഉണ്ടാക്കുന്നു.3 പേർ ജോലി ഉപേക്ഷിച്ചു പോയാൽ 48 പാവ ഉണ്ടാക്കാൻ എത്ര ദിവസം വേണം ?