A, B and C can do a piece of work in 12 days, 14 days and 16 days respectively. All three of them started the work together and after working for four days C leaves the job, B left the job 4 days before completion of the work. Find the approximate time required to complete the work. (in days)

A9 days

B11 days

C8 days

D7 days

Answer:

D. 7 days

Read Explanation:

The time is taken by A to complete the work = 12 days The time is taken by B to complete the work = 14 days The time is taken by C to complete the work = 16 days The total amount of work = L.C.M of (12, 14 and 16) = 336 units Efficiency of A =336/12 = 28 Efficiency of B = 336/14 = 24 Efficiency of C = 336/16 = 21 28x + 21(4) + 24(x - 4) = 336 28x + 84 + 24x - 96 = 336 52x - 12 = 336 52x = 336 + 12 = 348 52x = 348 x ≈ 7 days


Related Questions:

A pipe can fill a tank in 9 hours. Another pipe can empty the filled tank in 12 hours. If both the pipes are opened simultaneously, then the time (in hours) in which the tank will be two-third filled, is:
A cistern can be filled by a tap in 6 hours and emptied by an outlet pipe in 7.5 hours. How long will it take to fill the cistern if both the tap and the pipe are opened together?
One pipe fills a water tank 3 times faster than the other. If the two pipes together can fill the empty tank in 37 minutes, then how much time will the slower pipe alone take to fill the tank?
X ജോലിക്കാർക്ക് ഒരു ജോലി ചെയ്ത് തീർക്കാൻ 16 ദിവസം വേണം. എങ്കിൽ 2X ജോലിക്കാർക്ക് അതിന്റെ പകുതി ജോലി ചെയ്തു തീർക്കാൻ ആവശ്യമായ ദിവസം കണക്കാക്കുക.
If 200 men can dig a canal working for 8 hours a day in 6 days, how long will it take to dig the canal, if 300 men work 6 hours per day?