Challenger App

No.1 PSC Learning App

1M+ Downloads
A can do a work in 8 days and B in 12 days. They work together for 3 days. What part of the work is left?

A1/4

B5/8

C3/8

D7/24

Answer:

C. 3/8

Read Explanation:

Let's calculate their combined work rate.

Step 1: Individual work rates

  • A completes the work in 8 days → rate = (18)(\frac{1}{8}) per day

  • B completes the work in 12 days → rate = (112)(\frac{1}{12}) per day

Step 2: Combined rate

18+112\frac{1}{8}+\frac{1}{12}
=324+224=\frac{3}{24}+\frac{2}{24}
=524=\frac{5}{24}

Together, they complete (524)(\frac{5}{24}) of the work per day.

Step 3: Work done in 3 days

3×5243 \times \frac{5}{24}
=1524=\frac{15}{24}
=58=\frac{5}{8}

Step 4: Work left

1581-\frac{5}{8}
=38=\frac{3}{8}

Answer:(38) (\frac{3}{8}) of the work is left.


Related Questions:

Anjani can do a certain piece of work in 18 days. Anjani and Khushbu can together do the same work in 14 days, and Anjani, Khushbu and Sushmita can do the same work together in 9 days. In how many days can Anjani and Sushmita do the same work?
2 പേർ, 20 ദിവസം കൊണ്ട് 10 അടി ഉയരമുള്ള ഒരു മതിൽ കെട്ടും. എങ്കിൽ അതേ മതിൽ കെട്ടാൻ 5 ആളുകൾ എത്ര ദിവസങ്ങളെടുക്കും ?
X can complete a task in 15 days, and Y can complete the same task in 20 days. If X and Y work on alternate days starting with X, in how many days will the work be completed?
A, B, C can together complete the work in 12 days. If A is thrice faster than B, and B is twice faster than C , B alone can do the work in :
ജോണിക്ക് 40 ദിവസം കൊണ്ടും രാജുവിന് 48 ദിവസം കൊണ്ടും ബോബിക്ക് 60 ദിവസം കൊണ്ടും ഒരു ജോലി തീർക്കാൻ കഴിയും. അവർ 4 ദിവസം ഒരുമിച്ച് ജോലി ചെയ്തു. തുടർന്ന് രാജു പോയി. അതിനുശേഷം ജോണിയും ബോബിയും 12 ദിവസം ഒരുമിച്ച് ജോലി ചെയ്ത ശേഷം ജോണി പോയി. ബോബിയുടെ ജോലി പൂർത്തിയാക്കാൻ എത്ര ദിവസമെടുക്കും ?