A pipe can fill an empty tank in 15 hours, but due to a leakage at the bottom, it is filled in 20 hours. If the tank is full, how long will the leakage take to empty it if no other entry or exit point in the tank is open?

A50 hours

B60 hours

C40 hours

D30 hours

Answer:

B. 60 hours

Read Explanation:

The leakage will take 60 hours to empty the full tank completely.


1. Find the individual work rates

Let's assume the total capacity of the tank is a convenient number, like the Least Common Multiple (LCM) of 15 and 20, which is 60 units.

  • Filling Pipe Rate: If it fills the 60-unit tank in 15 hours, its efficiency is:
    6015=4 units/hour\frac{60}{15} = 4 \text{ units/hour}

  • Net Rate (Pipe + Leak): Due to the leakage, it takes 20 hours to fill the same 60-unit tank, so the combined efficiency is:
    6020=3 units/hour\frac{60}{20} = 3 \text{ units/hour}


2. Calculate the Leakage Rate

The difference between the standalone filling rate and the net filling rate is caused entirely by the leak:
Leakage Rate=Filling Pipe RateNet Rate\text{Leakage Rate} = \text{Filling Pipe Rate} - \text{Net Rate}
Leakage Rate=43=1 unit/hour\text{Leakage Rate} = 4 - 3 = 1 \text{ unit/hour}

This means the leak empties 1 unit of water every hour.


3. Determine the Time to Empty a Full Tank

To empty a completely full tank (60 units) at a rate of 1 unit per hour:
Time Taken=Total CapacityLeakage Rate=60 units1 unit/hour=60 hours\text{Time Taken} = \frac{\text{Total Capacity}}{\text{Leakage Rate}} = \frac{60 \text{ units}}{1 \text{ unit/hour}} = 60 \text{ hours}


Related Questions:

After 63 litres of petrol was poured into an empty storage tank, it was still 10% empty. How much petrol (in litres)must be poured into the storage tank in order to fill it?
A ഒരു ജോലി 10 ദിവസം കൊണ്ട് പൂർത്തിയാക്കും. B അതേ ജോലി 15 ദിവസം കൊണ്ട് പൂർത്തിയാക്കും. B ആ ജോലി ആരംഭിച്ച് 5 ദിവസം ജോലി ചെയ്യും, അതിനുശേഷം A ആ ജോലി പൂർത്തിയാക്കും. A എത്ര ദിവസം ജോലി ചെയ്തു?
A and B alone can complete a piece of work in 9 days and 12 days, respectively. In how many days will the work be completed if they work on alternate days starting with A?