App Logo

No.1 PSC Learning App

1M+ Downloads
A and B can do a piece of work in 28 days and 35 days, respectively. They work on alternate days starting with A till the work gets completed. How long (in days) would it take A and B to complete the work?

A311531\frac15

B311231\frac12

C3131

D311931\frac19

Answer:

3131

Read Explanation:

A can do the work in =28=28

B can do the work in =35=35

LCM of this two is the total work = 140

efficiency of A =140/28=5= 140/28=5

efficiency of B =140/35=4= 140/35=4

straiting A alternate with B the two day work is = 9

140/9=15140/9=15 and reminder 5

days =15×2=30=15\times 2=30

one day work is done by A

30+1=3130+1=31


Related Questions:

A pipe can filla tankin 30 minutes. Due to a leak in the bottom it is filled in 40 minutes. If the tank is full, how much time will the leak take to empty it?
ഒരു കമ്പ്യൂട്ടർ ലാബിൽ 6 കൂട്ടികൾക്ക് 3 കമ്പ്യൂട്ടർ ഉണ്ട്. 24 കൂട്ടികൾക്ക് എത്ര കമ്പ്യൂട്ടർ ഉണ്ടാവും?
A cistern can be filled by a tap in 6 hours and emptied by an outlet pipe in 7.5 hours. How long will it take to fill the cistern if both the tap and the pipe are opened together?
A and B together can work in 6 days. A alone 8 days. In how many days B alone do it?
K alone can complete a work in 20 days and M alone can complete the same work in 30 days. K and M start the work together but K leaves the work after 5 days of the starting of work. In how many days M will complete the remaining work?