In the specifications of earthwork, initial lead is specified as:

A10 m

B30 m

C20 m

D1.5 m

Answer:

B. 30 m


Related Questions:

The sanction of the detailed estimate, design calculations, quantities of works, rates and cost of the work by the competent authority of the engineering department is called:
Plinth area method is a method of________________
The Incidental expense of a miscellaneous character which cannot be reasonably predicted during preparation of the estimate is indicated by the term:
PERT analysis is based on:
The drawing essentially to be entered with the preliminary estimate: