The rule used for numbering events involved in project scheduling network is

AJohnson's rule

BFulkerson's rule

CHungarian rule

DSimplex rule

Answer:

B. Fulkerson's rule

Read Explanation:

Fulkerson's rule is used for numbering events in a project scheduling network. In this context, every activity in the network is assigned a name or symbol. The events are represented by circles at the beginning and end of each activity and are assigned numbers. This numbering system assists in accurately drawing the network. The numbers should be assigned to reflect the logical sequence of events in the network.


Related Questions:

For the use of concept, principles and approaches of group technology, the type of layout used is:
Work costs defined as
A technique of Work measurement in which times established for basic human motions are used to build up the time for a job at the defined level of performance is called:
Materials Requirement Planning is driven by
Which of the following heuristics in a one-machine shop will always minimize flow time and average number of jobs in the system?