Which one of the following estimates is prepared for technical sanction of the competent authority
Percentage of contractors profit added with estimated amount is
The drawings essentially to be enclosed with the Preliminary estimate
A fresh detailed estimate of the additional works in additional to the original is known as
Which of the following is the most correct estimate
The fresh detailed estimate of the additional work in addition to the original when further development is required during the progress of the work
An accurate method of estimate, consists of working out the quantities of each item of works of a project
The initial lead (or- normal lead) distance,in earthwork estimation is employed is
Which of the following, is not an approximate estimate
The accurate estimate which consist of working out the quantities of each items of works and their cost is called
Unit of stone masonry
While submitting a tender the contractor is to deposit 2% of estimated cost as
The fresh detailed estimate of the additional work in addition to the original one is called
In long and short wall method of estimation,the length of long wall is the centre to centre distance between the walls and
CPM Network is:
The main factor to be considered while preparing a detailed estimate is:
The item of wood work which is measured in m^2 is:
In long and short wall method of estimation the length of long wall is equal to centre to centre distance between walls and:
Breaking down is the process of:
The printed list of various items of work for preparing detailed estimate and is maintained by the engineering department:
CPM means:
Provision for work charged establishment included in the estimate is:
When the expenditure of a work exceeds or likely to exceed the amount of sanctioned estimate by more than 10%, then the prepared detailed estimate is known as:
Cube rate estimate is prepared on the basis of:
Which of the following is a PERT event:
The post-operation in CPM are marked:
Gantt chart indicates:
A property through physically sound, but it becomes out of date in style, structure in design and thus it loses its functional utility, this is:
In critical path method the performance of a specific task is called
The drawing essentially to be entered with the preliminary estimate:
The process of inviting bids and accepting them is known as:
The interrelationship between the functional elements of a programme is achieve through:
Latest finish time in CPM technique is indicated by a:
The capacity of doing work by a skilled labour, is the form of quantity of work per day is known as:
The sanction of the detailed estimate, design calculations, quantities of works, rates and cost of the work by the competent authority of the engineering department is called:
Which department looks after the execution and maintenance of water supply and sanitary works?
The time by which a particular activity may be delayed without affecting the preceeding and succeeding activities is known as:
Work costing less than 20,000 is called:
The head of the division of public works department is
The most reliable estimate is :
PERT stand for:
In PERT technique, completion of an activity is called:
The most reliable estimate is:
PERT analysis is based on:
When the expenditure on a work exceeds or is likely to exceed the amount of administrative sanction by more than 10%,
Barbed wire fencing units of measurement in MKS
Life period of a building should be at least .......................years
Area of the horizontal circulation may constitute about ........................of the total plan area of a residential building
As per National Building Code, the minimum area for a kitchen in residential building is
While submitting tender the contractor is to deposit 2% of estimated cost as