App Logo

No.1 PSC Learning App

1M+ Downloads
The example for auxiliary water resources is:
The Theissen polygon method is used to compute
Margin between water level and top of dam is called
The water stored in the reservoir below the minimum pool level is called:
The flow duration curve is a plot of:
The sheet of liquid flowing over notch is known as
Volume of water stored in a reservoir between minimum pool level and normal pool level is..................................
Liquid precipitation consists of:
A precipitation in the form of water droplets of size less than1 mm/hr is known as
The main function of a diversion headwork of canal form river is:
A solid construction put across the river to raise its water level and divert the water into the canal known as:
Unit hydrograph method for flood estimation is usually applied to:
The best irrigation method that suits are where scarcity of irrigation water is
Irrigation canals are generally aligned along :
The difference of water level in the head race and in the tail race in a hydro electric project is known as
Hydrographic survey deals with the mapping of