For plastering with cement mortar 1:5, 12 mm thick one coat, the quantity of cement for 10 m²
Which one of the following estimates is prepared for technical sanction of the competent authority
Percentage of contractors profit added with estimated amount is
The drawings essentially to be enclosed with the Preliminary estimate
A fresh detailed estimate of the additional works in additional to the original is known as
The estimate prepared on the basis of plinth area multiplied by the height of building is
Which of the following is the most correct estimate
The fresh detailed estimate of the additional work in addition to the original when further development is required during the progress of the work
The unit of quantity of shutters of door and window is calculated in
An accurate method of estimate, consists of working out the quantities of each item of works of a project
The size of a room is 5 m x 3 m, thickness of wall 20 cm and a slab projection of 30 cm from walls. If the thickness of slab is 100 mm,the quantity of cement concrete required for room slab
When small items, are estimated, for which detailed quantities cannot be taken out,they are considered as
The unit of measurement, for reinforced cement concrete, work is
The unit of measurement, for 'pointing of stone masonry' work is
The out- turn of a mason/day, in 'Brickwork using cement motor in super structure, as per standards, should be
The initial lead (or- normal lead) distance,in earthwork estimation is employed is
Which of the following, is not an approximate estimate
The accurate estimate which consist of working out the quantities of each items of works and their cost is called
Quantity of cement required for 1 m of cement concrete mix 1:2:4
Unit of wood work planed and framed for frames of doors and windows
Unit of stone masonry
Quantity of water required per 50 kg of cement, for M20 concrete mix
While submitting a tender the contractor is to deposit 2% of estimated cost as
While estimating the area of wall plastering deduction is made for both sides openings, when the area of the opening is
Quantity of cement required for one cubicmeter R.R.M. in 1:8 cement mortar
The fresh detailed estimate of the additional work in addition to the original one is called
For plastering with cement mortar 1:4, 12mm thick one coat, the cement required for10 m² is
In long and short wall method of estimation,the length of long wall is the centre to centre distance between the walls and
CPM Network is:
The main factor to be considered while preparing a detailed estimate is:
The item of wood work which is measured in m^2 is:
In long and short wall method of estimation the length of long wall is equal to centre to centre distance between walls and:
Breaking down is the process of:
The printed list of various items of work for preparing detailed estimate and is maintained by the engineering department:
The rate of an item of work depends on:
CPM means:
Provision for work charged establishment included in the estimate is:
When the expenditure of a work exceeds or likely to exceed the amount of sanctioned estimate by more than 10%, then the prepared detailed estimate is known as:
Cube rate estimate is prepared on the basis of:
Which of the following is a PERT event:
The post-operation in CPM are marked:
In MKS system, the rate of payment for supply of paint ready mix is per:
Gantt chart indicates:
A property through physically sound, but it becomes out of date in style, structure in design and thus it loses its functional utility, this is:
The printed book given the rate of each item in estimating and costing is:
In critical path method the performance of a specific task is called
Art of determining the present value of property is
The drawing essentially to be entered with the preliminary estimate:
The process of inviting bids and accepting them is known as:
The interrelationship between the functional elements of a programme is achieve through: