Challenger App

No.1 PSC Learning App

★
★
★
★
★
1M+ Downloads
A and B are jogging around a park's circular track which has a perimeter of 1.2 km. They start from the same point at 6:00 a.m. and run in opposite directions. A's speed is 5 km/h, and B's speed is 7 km/h. At what time will they meet for the fifth time?

A6:25 AM

B6:30 AM

C6:45 AM

D7:00 AM

Answer:

B. 6:30 AM

Read Explanation:

Track perimeter (= 1.2) km

Since they run in opposite directions, relative speed:

5+7=12 km/h5 + 7 = 12 \text{ km/h}

Time for one meeting:

1.212=0.1 hour\frac{1.2}{12} = 0.1 \text{ hour}

0.1 hour=6 minutes0.1 \text{ hour} = 6 \text{ minutes}

So they meet every 6 minutes.

For the 5th meeting:

5×6=30 minutes5 \times 6 = 30 \text{ minutes}

Starting time = 6:00 a.m.

6:00+30 minutes=6:30 a.m.6:00 + 30 \text{ minutes} = 6:30 \text{ a.m.}

So, they will meet for the fifth time at:

6:30 a.m.\boxed{6:30\ \text{a.m.}}


Related Questions:

ഒരു പുരുഷനും ഒരു കുട്ടിയും ചേർന്ന് ചെയ്യുന്ന ജോലിയേക്കാൾ നാലിരട്ടി ജോലി 5 പുരുഷന്മാരും 2 കുട്ടികളും ചേർന്ന് പൂർത്തിയാക്കി എങ്കിൽ ഒരു പുരുഷനെയും ഒരു കുട്ടിയുടെയും ജോലി ചെയ്യാനുള്ള കഴിവിന്റെ അനുപാതം എത്ര ?
The amount of money earned on a job is directly proportional to the number of hours worked. If INR 324 is earned in 6 hours, then how much money (in INR ) will be earned in 29 hours of work?
18 ജോലിക്കാർ 5 ദിവസം കൊണ്ട് ചെയ്തു തീർക്കുന്ന ഒരു ജോലി 6 ദിവസം കൊണ്ടു ചെയ്തു തീർക്കാൻ എത്ര പേർ വേണം?
A can do a piece of work in 10 days. He works at it for 4 days and then B finished the remaining work in 9 days. How long will they take to complete the work if they do it together?
Kiran can do a certain piece of work in 15 days. Kiran and Garima can together do the same work in 10 days, and Kiran, Garima and Mehak can do the same work together in 9 days. In how many days can Kiran and Mehak do the same work?