App Logo

No.1 PSC Learning App

1M+ Downloads
The capital cost of the building does not include

ACost of construction

BCost of water supply and sanitary fittings

CScrap value

DCost of electrification

Answer:

C. Scrap value


Related Questions:

The maximum frictional force which comes in to play when a body just begins to slide over the surface of another body is known as
The estimate of tensile strength from Compressive strength of concrete may be estimated by
The projected portion of the tread beyond the face of the riser is
The type of bond in which every course contains both headers and stretchers, is called
The non-clog pump which permits solid matter to pass out with the liquid sewage, is: