As opposed to detailed transaction information, the MIS responds to the need for
Bin Card is the record preserved under the perpetual inventory system in -
ABC inventory control focuses on those
The time for which a piece of equipment operates is called
The basic purpose of multiple activity chart is to
A time study is done to assess how long it will take to perform a task by
The rule used for numbering events involved in project scheduling network is
Which one of the following is NOT a technique of inventory control?
Adaptive response rate forecasting is related to
Work costs defined as
The process of fixing the sequence of operations and material flow is
Which philosophy eliminates sources of manufacturing waste by producing the right part in the right place at the right time?
Bin cards are used in keeping record of -
The correct sequence of increasing production volume is
Which one of the following is not a characteristic of JIT manufacturing system?
A production line is said to be balanced when
The correct sequence of operations in production planning and control is
Which of the following is a type of pre-emptive job scheduling done by the operating systems?
What is the full form of MPS in manufacturing?
What is the full form of MPS in manufacturing?
The primary function of a___________________is to produce a record of an existing set of conditions so that the job of seeing what is actually taking place is made as simple as possible.
Which one of the following contains design data on all products, e.g., their constituent components and parts?
Which of the following is a type of indirect inventory?
Travel chart mainly helps
Procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organization and control of their work, is termed as:
Which is the last stage of the product planning and development process?
In an MRP system, component demand is
Sequencing is a subset of
Which one of the following scheduling measures is not related to due date or delivery time?
Production cost refers to prime cost plus
During the development of a product an entirely new process plan is made based on design logic, examination of geometry and tolerance information. This type of process planning is known as
Materials Requirement Planning is driven by
Consider the following statements with respect to flow diagram in work-study:Which of the statements are correct?
Movement of machines is drawn in flow diagram.
Movement of men is drawn in flow diagram.
In flow diagram, all movements are drawn true to scale.
Micro motion study is called
In case of batch production the preferred layout will be
For the use of concept, principles and approaches of group technology, the type of layout used is:
Materials handling system includes
Material Requirements Planning DOES NOT include
The "Information transmission device" used for system of inventory and production control is known as
In forecasting by exponential smoothing, if a is a smoothing constant, then:
Fixed period systems are also termed as _________________ systems of inventory control.
VED analysis of inventory control stands for:
The process is deemed to be out of control, when causes are present.
In production planning and control, Sequencing problem can be solved using -
The output of an aggregate plan is
Which one of the following is correct? Production, planning and control functions are extremely complex in
Performance rating of an employee may be expressed as:
Among the following, identify the one which is not a component of a control system.
When we view processes as interconnected components of a system, we tend to avoid: