Challenger App

No.1 PSC Learning App

1M+ Downloads
The height of an embankment of formation width 10 m with side slope 1: 2 is found to be 2 m. The area of section will be
An accurate method of estimate, consists of working out the quantities of each item of works of a project
The term implies carefully taking up or down to ground and removing all materials without damage
Unit of earth work excavation
In taking the measurement of plastered area no deduction shall be made for opening exceeding
The standard unit for flooring
The quantity of mortar required for standard unit of brick work in CM 1:6
The weight per meter runs of 12 mm dia bar
A slab of 5.05 m * 3.05 m and thickness 100 mm is provided with a main bar of 10 mm dia @ 200 mm c/c and distributing bar 8 mm dia at 200 mm c/c with a cover of 25 mm.The number of main reinforcement is
Plan and Elevation of a line segment are seen coincide, the line is situated in the
Collimation line is
Reciprocal levelling is used to determine
Chromatic aberration is a defect of lens due to
1 Minute =
The maximum permissible limit of error in chain survey is
In prismatic compass, the graduations are marked from zero at the
Dip of magnetic needle at the equator is
The schedule of rates are revised and published by
Average rainfall in Kerala is
Critical velocity in a channel is
A passage meant for the flow of surplus water over dam
The margin between crest of a dam or canal bank and full supply level is
Metallic tape is made up of
Invar tape is used:
Unit rate of work is obtained by
Load bearing wall structures are applicable to building those have
One hectare in:
Least count in the vertical circle of theodolite is
Reciprocal ranging is applicable in surveywork
The area measured by a 20 m chain, 0.5 link too short, is found to be 120 hectares. What will be the true area
In chain survey field book the chainages are entered in ascending order from
The sketch of land prepared by the surveyor during reconnaissance is known as:
In chain survey reference sketches are used
In the absence of cross staff right angles can be set out from chain line by a chain or tape
Azimuth is nothing but
Magnetic bearing of a line AB is S.32° E.What is the true bearing of the line, when the declination is 8° 16'
FB. of a line is 88 30'. What is its B.B.
Transiting means
The object of two point problem is
In reciprocal levelling
The length of a rectangle is two times breadth. If the perimeter 36 m what will be the area
Specific gravity is
Pyrometer is used to measure:
Absolute pressure is
Depth of foundation is found out by a
Minimum thickness of stone masonry is
In a closed traverse of side n, the sum ofinterior angles is =
The longest line in chain survey work is called:
Magnetic bearing of a line AB is 120°, find its true bearing if the direction of magnetic north at A is 9°15' west of true north
Find the value of the magnetic declination if the magnetic bearing of the Sun at noon is 184°